skip to Main Content
+34 93 662 14 41 info@garciafaura.com
Over 1,100 Enclosures For The New Installations At El Prat
Over 1,100 Enclosures For The New Installations At El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Més De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat
Over 1,100 Enclosures For The New Installations At El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El PratMés De 1.100 Tancaments Per A Les Noves Instal·lacions D'El Prat

Amazon Logistics Centre

El Prat de Llobregat. Year of completion: 2017 Architect: Idom Project surface area: Motorised windows: 156 units | Turn/tilt windows: 252 units | Fixed windows: 756 units

The electronics business giant has invested €200 million in a new logistics centre, the second of its type in Spain. It is located strategically near to Barcelona’s airport and port. With a total warehousing capacity covering 210,000 m2 over various levels and constructed on a footprint of 150,000 m2, it is the largest and most modern logistics centre in the South of Spain.

GARCIA FAURA developed the set of enclosures for this expansive logistics site. In total, almost 1,200 windows were installed – the majority of which are fixed or tilt/turn and some are motorised. The main challenge of this project was meeting the works scheduling requirements, which set the bar for the installation works very high. The company used its entire production and installation capacity in this scheduled works, and as a result, completed the project successfully without compromising on quality or technical performance.

Back To Top