The new headquarters for the Court of Law comprises three buildings arranged orthogonally within a 3.2 hectare plot and with a constructed area of 36,500 m2. The main access is arranged symmetrically to the central building and is delimited by an atrium of four separate floors. The Head Office, the Auditorium and Events Hall are situated to the sides. The new headquarters houses more than 1,200 staff members who were previously spread out over more than 10 different facilities in the Calidonia district.
GARCIA FAURA was responsible for the fabrication and installation of railings throughout the entire building. They are constructed using metallic profiles in matt dark brown finish. They are complemented by vertical posts and handrails. The metal structure roofing system comprises gypsum panel cladding and reinforced cement. Once on site and prior to installation, all panels received an exterior treatment to reinforce their durability and provide the product with the visual aesthetics defined in the project.